top of page

Completed landscapes and pools across Dubai

Over 240 landscapes and 180 pools completed.

One team, not five contractors

Turnkey pool build in 10 to 14 weeks; 5-year structural warranty on every pool.

Turnkey with Palm Crest

One contract and one site manager from first sketch to final commissioning.

Design, excavation, pool construction, planting and handover run as a single programme.

A fixed schedule, with dates that hold.

One warranty covering the whole project.

Multiple contractors

Liability is split, so every fault becomes someone else’s problem.

Site works overlap and crews get in each other’s way.

Pool leaks mean retiling and replanting what was just finished.

Gaps open between landscaper and pool builder, and dates drift.

↘

A recent Al Barari villa, week by week

Turnkey pool build in 10 to 14 weeks.

01 · Weeks 1–2

Survey, levels and 3D design sign-off.

02 · Week 3

Excavation and shoring.

03 · Weeks 4–5

Steel, shotcrete shell and plumbing.

04 · Weeks 6–7

Waterproofing and tiling.

05 · Week 8

Plant room, filtration and lighting.

06 · Weeks 9–11

Decking, planting and irrigation.

07 · Week 12

Water balance, commissioning and handover walkthrough.

Planning a space like these? Let’s talk through your project.

Design consultation on site, free within Dubai.

↘

Tell us about your project

Based in Dubai, serving the UAE since 2012.

Design consultation on site, free within Dubai.

We reply within one working day and schedule site visits within the week.

Project Type
Landscaping
Pool Construction
Both Landscaping
Maintenance

Your questions answered

Based in Dubai, serving the UAE since 2012. Turnkey pool build in 10 to 14 weeks. 5-year structural warranty on every pool. Maintenance plans from AED 1,200 per month.

What does a pool cost?

Every pool is priced by scope: size, shape, finishes, equipment and landscaping around it. After a site survey we fix the price in writing, so the figure you approve is the figure you pay. Maintenance plans start from AED 1,200 per month.

How long does a build take?

A turnkey pool build takes 10 to 14 weeks from approved design to handover. Excavation, structure, finishing and commissioning run in a clear sequence, and you receive a dated schedule before work begins.

What permits are needed?

Dubai Municipality and community approvals are required for most projects. We prepare the drawings, submit the applications and follow them through, so you do not have to deal with the authorities yourself.

Do you work outside Dubai?

Yes. We are based in Dubai and have served the UAE since 2012, building pools and gardens across the emirates. Tell us your location and we will arrange a survey visit.

What does the warranty cover?

Every pool carries a 5-year structural warranty covering the shell, plumbing and waterproofing. Normal wear, misuse, and damage from third-party work or neglected upkeep are not covered.

What maintenance plans exist?

Plans start from AED 1,200 per month. They include scheduled water testing, cleaning, equipment checks and garden care, with a technician visiting on a fixed day each week.

Can you renovate an existing pool or garden?

Yes. We resurface and re-tile pools, replace pumps and filtration, and redesign tired gardens, often while keeping the structure you already have.

Who manages the site day to day?

A dedicated project manager is on site throughout the build and reports to you weekly with photos and progress notes. You always have one person to call.

bottom of page